Building and Construction Permit

Building and construction permits are the main instrument for controlling or managing physical development. Development permit in this context refers to permits issued in relation to development plans and building permit applications.

Effective development management promotes orderliness, convenience of movement, public safety and enhanced economic development.

Development Permitting deals with the correct use the land, the appearance of the proposed building and the effect that the development will have on the general environment and neighboring properties.

A development permit is a written permission authorizing a person to carry out development in accordance with conditions specified in the permit. Such development permit shall give due considerations to matters relating to zoning, planning standards and structural conditions of the proposed development.

A Building Permit allows construction of buildings or structure to proceed on condition of compliance to building code.

A Building Permit deals with the manner in which a building is constructed, for instance its structural stability, fire resistance, weather resistance, etcetera.

Erection of any building or structure except those exempt by law

  • All physical development involving the erection of any structure,
  • making of structural alteration or transformation of any structure,
  • execution of any works or installation of any fittings in connection with any structure,
  • engineering, mining or other operations on, in, under or
  • over land or the material change in the existing use of land or building comprising among others the sub-division of land,
  • disposal of waste on land including the discharge of effluent into a body of still or running water and
  • The erection of an advertisement or other hoarding among others shall require a development permit.

Act 480, Section 48; Act 936, Sections 91 (1) & 106 (1) and Act 925 Sections 113 & 117 (1&2)

Structural alteration or renovation

Any transformation to a building or structure to restore it to its original state in terms façade, fixtures or sewage system shall require a renovation permit from the Assembly.

Also a transformation or alteration of any permitted structure or building which results in structural changes (remodeling) shall require a permit from the Assembly

Property hording

Any temporary structure or fence erected round a building or construction site shall require a planning permit

Public safety shall be ensured and pollution in relation to air, water, noise and soils shall be avoided or properly mitigated.

A hoarding permit shall be incorporated into all Development applications (except for already fenced structures of property) and treated as one application.

Temporary structural permit

A temporary structure is any physical structure constructed, installed or placed on spaces zoned for permanent uses and meant to facilitate the construction of a permanent structure, serve short term emergency needs or facilitate small scale business operations.

The temporary permit shall be renewable every six months for a period not exceeding five years.

  • Permits for Temporary structures shall be issued to developments that are not permanent in nature.
  • Permits for Temporary structures shall be renewed every 6 months.

Temporary Structure Permit applications shall be presented on form.

The basic requirements for a temporary structure permit are:

  1. Application form
  2. Evidence of good title to the land or permission from relevant stakeholders
  3. Site Plan to the scale of 1:2500 or 1:1250 and conforming to the local plan of the area
  4. Block Plan to the scale of 1:50
  5. Designs of proposed temporary structures

An applicant shall be required to obtain all necessary approvals, permits and licenses from relevant central and local government authorities.

Extension of existing building

The addition of a usable area or utility space to an existing structure shall constitute an extension.

Applications for permit to extend existing structures which do not have prior permit shall be treated solely as applications for regularization of permit.

Demolishing permit

All demolition works shall require permit from the Assembly. Sufficient precaution shall be taken to safeguard public safety, health, adjoining properties and properties with heritage significance.  Pollution in relation to air, water, noise and soils shall be avoided or properly mitigated.

 Application for Demolition Permit

Persons seeking to apply for demolition permit shall complete an application form designed for the purpose including information that ensures that the following basic requirements have been fully fulfilled:

  1. Site plan
  2. Block plan
  3. Demolition plan and precautions outlined
  4. Current Pictures of the structures to be demolished
  5. Acknowledgment of utility services disconnection (electricity, water, sewer, etc)

Statutory requirements for a Development/Building permit

  1. Submit your full set of application to the Physical Planning Department
  2. Attach completed  land ownership  document from Lands Commission
  3. Attach four copies of architectural drawings signed by a certified Architect
  4. Attach four copies of structural drawings signed by an Engineer
  5. Proposed development must conform to zoning status
  6. A certified soil test report
  7. Fire certified report including drawings from the Ghana National Fire Service
  8. Environmental Protection Agency Permit
  9. Structural integrity report in case construction development has already commenced or is completed

In addition to the statutory requirements above, in the Kwahu East District the following requirements also apply;

  1. Business Registration Certificate (for organizations).
  2. Business Operating Permit (for organizations).
  3. Up to date Property Rate payment (Existing Buildings)
  1. Note:
  2. For Organisations: A developer may be asked to provide additional information depending on usage, size, etc.
  3. For Existing Buildings: Some Development Projects require a prior application for “Planning Permission –in- Principle” before application for a substantive Development /Building permit.

 

  • Apart from the cost of the Permit Application Form and Processing Fees, all other costs are arrived after going through each process based on the fee fixing resolution of the Assembly for that year.
  • The Fee fixing Resolution for each year is published on the Assembly’s Website and copies can also be purchased as the Ghana Publishing Company (Assembly Press).

House renovation

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa.

Small Projects

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa.

Interior Design

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa.

Big Projects

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa.